Civil and Structural Engineering and Planning Projects
"From Concept to Completion" - Since 1974
Australia, Brunei, China, Hong Kong, India, Indonesia, Japan, Malaysia, New Zealand, Philippines, Singapore, Thailand and UAE

BURCHILL VDM PTY LIMITED

Consulting Engineers
& Planners

VDM logo

HOME
Corporate Profile
Structure and People
Contacts
Employment
What's New
Newsletters
Press Articles
Links
The Gold Coast
Project Portfolio:-
   Integrated Resorts
   Major Buildings
   Golf Courses and Estates
   Marina Developments
   Waterfront and Canals
   Residential Estates
   Major Planning Studies
   Traffic and Transportation
   Highways and Bridges
   Townhouses
   Retirement Villages
   Schools and Hospitals
   Sporting Facilities
   Caravan and Mobile Homes
   Industrial Estates
   Retail/Commercial
   Ferry Terminals
   Theme Parks & Attractions
   3D Modelling

BackProject PortfolioNext

  PROJECT:

THE SOVEREIGN ISLANDS

  LOCATION:

Gold Coast, Flag - Australia Australia

  CATEGORY: Waterfront and Canal Estates

Sovereign Islands, Gold Coast, Australia

Project Details: The Sovereign Islands is a unique, prestigious large scale Lewis Land Corporation residential development situated in the Southport Broadwater comprising 6 interconnected islands and providing deep water frontage allotments with uninhibited access to the Gold Coast Seaway.

Created from sand islands and an additional special lease reclamation of 1.4 million cubic metres dredged from surrounding navigation channels, the Sovereign Islands became the first water frontage housing development in Australia to offer wall to wall water capable of floating luxury yachts and power boats at all stages of the tide.

Burchill VDM Involvement: Burchill VDM have been responsible for detailed planning, design and construction contract administration, large scale dredged land reclamation, and for the revetments and residential infrastructure works almost since the beginning, back in 1988.

Some of the development's statistics:

  • Total length of revetment - 14.4km
  • Total canal length - 6.4km
  • Total road length - 10km
  • Total reclamation earthworks - 2.3 million cubic metres of fill
  • Total concrete used - 25,000 cubic metres
  • Total allotments - 713 (all but three on deep water frontage)
  • Blocks in the latest stage sold for over AUD$2 million each.
If you have any problems, comments or questions with this website please contact Webmaster.
Copyright January 2007 BURCHILL VDM PTY LIMITED
Head Office Phone: +61 7 5574 0511 Fax: +61 7 5574 0011 Email
[  ]